vesinisa ◴[] No.44039149[source]
Here's a much better article from the Finnish public broadcaster giving more context: https://yle.fi/a/74-20161606

My comments:

The important thing to note that at this point it's just a political posturing and an announcement of intent. They haven't shown any concrete technical plan how this would actually be executed.

> "Of course, we are very pragmatic and realistic, we cannot do this in five years. Planning will continue until the end of the decade, and maybe in 2032 we can start construction."

Once they have the cost estimates and effects on existing rail traffic studied, I bet construction will never start.

replies(10): >>44039465 #>>44039611 #>>44039693 #>>44039743 #>>44039754 #>>44039771 #>>44039846 #>>44040123 #>>44040743 #>>44045724 #
sbuttgereit ◴[] No.44040123[source]
On the other hand....

"Unification to standard gauge on May 31 – June 1, 1886 [United States]

In 1886, the southern railroads agreed to coordinate changing gauge on all their tracks. After considerable debate and planning, most of the southern rail network was converted from 5 ft (1,524 mm) gauge to 4 ft 9 in (1,448 mm) gauge, then the standard of the Pennsylvania Railroad, over two days beginning on Monday, May 31, 1886. Over a period of 36 hours, tens of thousands of workers pulled the spikes from the west rail of all the broad gauge lines in the South, moved them 3 in (76 mm) east and spiked them back in place.[6] The new gauge was close enough that standard gauge equipment could run on it without problem. By June 1886, all major railroads in North America, an estimated 11,500 miles (18,500 km), were using approximately the same gauge. To facilitate the change, the inside spikes had been hammered into place at the new gauge in advance of the change. Rolling stock was altered to fit the new gauge at shops and rendezvous points throughout the South. The final conversion to true standard gauge took place gradually as part of routine track maintenance.[6] Now, the only broad-gauge rail tracks in the United States are on some city transit systems."

https://en.wikipedia.org/wiki/Track_gauge_in_the_United_Stat...

replies(7): >>44040226 #>>44041022 #>>44041027 #>>44042299 #>>44042678 #>>44043266 #>>44043312 #
PaulRobinson ◴[] No.44041022[source]
An impressive feat, that is unlikely unachievable on a modern train network.

The tolerances are just a bit tighter, the risks and liabilities are higher, and the workforce just isn't "there" - this is from a time when rail was a huge money earner and could afford to employ a huge number of people. Today? Not so much, pretty much anywhere in the World.

replies(3): >>44042014 #>>44043526 #>>44044058 #
Suppafly ◴[] No.44043526[source]
>The tolerances are just a bit tighter, the risks and liabilities are higher, and the workforce just isn't "there"

Sure, but they do it with big machines that ride down the rails now instead of lining up thousands of men with sledge hammers.

replies(1): >>44044138 #
crote ◴[] No.44044138[source]
There are no ready-made gauge changing machines, though. Not exactly a big market for those.
replies(4): >>44045002 #>>44046492 #>>44049220 #>>44052942 #
wkat4242 ◴[] No.44045002[source]
Once Spain and Portugal move from Iberian gauge that market will increase a lot. Which is kinda inevitable with the added environmental pressure on flights.
replies(1): >>44056740 #
1. wyan ◴[] No.44056740{3}[source]
It is taking decades to achieve though!