The important thing to note that at this point it's just a political posturing and an announcement of intent. They haven't shown any concrete technical plan how this would actually be executed.

> "Of course, we are very pragmatic and realistic, we cannot do this in five years. Planning will continue until the end of the decade, and maybe in 2032 we can start construction."

Once they have the cost estimates and effects on existing rail traffic studied, I bet construction will never start.

replies(10): >>44039465 #>>44039611 #>>44039693 #>>44039743 #>>44039754 #>>44039771 #>>44039846 #>>44040123 #>>44040743 #>>44045724 #
sbuttgereit ◴[] No.44040123[source]
On the other hand....

"Unification to standard gauge on May 31 – June 1, 1886 [United States]

In 1886, the southern railroads agreed to coordinate changing gauge on all their tracks. After considerable debate and planning, most of the southern rail network was converted from 5 ft (1,524 mm) gauge to 4 ft 9 in (1,448 mm) gauge, then the standard of the Pennsylvania Railroad, over two days beginning on Monday, May 31, 1886. Over a period of 36 hours, tens of thousands of workers pulled the spikes from the west rail of all the broad gauge lines in the South, moved them 3 in (76 mm) east and spiked them back in place.[6] The new gauge was close enough that standard gauge equipment could run on it without problem. By June 1886, all major railroads in North America, an estimated 11,500 miles (18,500 km), were using approximately the same gauge. To facilitate the change, the inside spikes had been hammered into place at the new gauge in advance of the change. Rolling stock was altered to fit the new gauge at shops and rendezvous points throughout the South. The final conversion to true standard gauge took place gradually as part of routine track maintenance.[6] Now, the only broad-gauge rail tracks in the United States are on some city transit systems."

https://en.wikipedia.org/wiki/Track_gauge_in_the_United_Stat...

replies(7): >>44040226 #>>44041022 #>>44041027 #>>44042299 #>>44042678 #>>44043266 #>>44043312 #
PaulRobinson ◴[] No.44041022[source]
An impressive feat, that is unlikely unachievable on a modern train network.

The tolerances are just a bit tighter, the risks and liabilities are higher, and the workforce just isn't "there" - this is from a time when rail was a huge money earner and could afford to employ a huge number of people. Today? Not so much, pretty much anywhere in the World.

replies(3): >>44042014 #>>44043526 #>>44044058 #
Suppafly ◴[] No.44043526[source]
>The tolerances are just a bit tighter, the risks and liabilities are higher, and the workforce just isn't "there"

Sure, but they do it with big machines that ride down the rails now instead of lining up thousands of men with sledge hammers.

replies(1): >>44044138 #
1. crote ◴[] No.44044138[source]
There are no ready-made gauge changing machines, though. Not exactly a big market for those.
replies(4): >>44045002 #>>44046492 #>>44049220 #>>44052942 #
2. wkat4242 ◴[] No.44045002[source]
Once Spain and Portugal move from Iberian gauge that market will increase a lot. Which is kinda inevitable with the added environmental pressure on flights.
replies(1): >>44056740 #
3. reaperducer ◴[] No.44046492[source]
There are no ready-made gauge changing machines, though. Not exactly a big market for those.

So what? I'd there isn't a machine, you build one.

Large industries like mining and shipping and the military don't just stop because they can't buy a needed item off the shelf because there isn't a market for it. They build stuff all the time.

I worked in a factory for a few years, and can tell you that if industries followed your "can't do" attitude, commerce would stop.

replies(2): >>44047690 #>>44050223 #
4. owenversteeg ◴[] No.44047690[source]
Yeah, in theory, but the vibes are different.

Let’s say you have a problem and the only way to solve it is with a thingamabob. The thingamabob doesn’t exist, so you need to make the first one. Unknown to everyone, the military, the O&G/mining industry, and the rail industries all try to build one at the same time. Do you think they all cost the same? What about the time to design and build them?

The oil and gas people will call up some machinists and engineers the same day. Time is money and they need the problem solved. It doesn’t need to look pretty. I don’t think anyone would disagree that they would be the first with a thingamabob. First one might break, they’d get Bob on a Cessna from the nearest machine shop with a replacement.

The military would have some meetings, which would spawn more meetings, and eventually put out some requests for proposals. They’d review the proposals and ten years later they’d have their thingamabob. No doubt it would be the most expensive.

The rail industry… the modern, passenger rail industry in wealthy western countries? There might be proposals, or designs or prototypes with large amounts of money spent, but I think it is reasonable to say the thingamabob would never actually be built and used. Look at CAHSR or Stuttgart 21 or Turin-Lyon.

5. mikewarot ◴[] No.44049220[source]
There are ready-made machines that pull up track, and replace sleepers... it shouldn't be a major project to allow it to change the gauge of the rail as it resets it.
6. red_admiral ◴[] No.44050223[source]
Switzerland has some for narrow (meter) gauge to standard gauge. I think it's to make the Glacier Express run without changing train. Had a bit of teething problems at the start but seems to be working well now.

That's not a "change gauge for a 100-wagon freight train" scale operation, and it's not "off the shelf" tech, but we're fairly close I think?

7. Suppafly ◴[] No.44052942[source]
>There are no ready-made gauge changing machines, though. Not exactly a big market for those.

I'm not a train guy, but I'm pretty sure the machine that lifts the track up and allows them to swap out the ties is like 95% of what would be needed for a gauge changing machine.

8. wyan ◴[] No.44056740[source]
It is taking decades to achieve though!