A scary way to set a schedule on a complex project with lives at stake. They don't care though.
A scary way to set a schedule on a complex project with lives at stake. They don't care though.
Also, corners were cut in the testing. (Full stack testing.)
Full stack testing was not cutting corners. After ground testing it was deemed that incremental testing would not be beneficial. Doing tasks in parallel instead of in series can introduce project risks, but that's not the same thing as cutting corners, which is where something necessary is not done at all.
The idea that rocket X not exploding in a single launch makes it man-rated is cutting corners.
Full stack testing was testing the entire rocket at the same time instead of using dummy stages to test parts of the rocket separately. There was opposition to it because if the rocket failed it might be difficult to diagnose why exactly it failed, which would slow the project down in the long run. Based on the ground testing and advances in instrumentation, the risk of a project delay from a failure was considered acceptable. It still took multiple launches to man rate the rockets. There's a reason the first manned launch of the Saturn V was Apollo 8.