We need to drive down the costs of implementing nuclear energy. Most of it are fake costs due to regulation. I understand that regulation is needed but we also need nuclear energy, we have to find a streamlined way to get more plants up and running as soon as possible. I think they should all be government projects so that private companies can't complain that they're losing money and keep have to ratchet up the prices, like PG&E in California. My rates have doubled in a few years to over $0.40/kWh and up over $0.50/kWh after I go up a tier depending on usage.
replies(39): >>45225431 #>>45225480 #>>45225524 #>>45225535 #>>45225565 #>>45225613 #>>45225619 #>>45225755 #>>45225860 #>>45225949 #>>45225961 #>>45226031 #>>45226055 #>>45226067 #>>45226154 #>>45226181 #>>45226458 #>>45226594 #>>45226646 #>>45226658 #>>45226803 #>>45226943 #>>45226958 #>>45227052 #>>45227098 #>>45227206 #>>45227241 #>>45227262 #>>45227391 #>>45227592 #>>45227750 #>>45228008 #>>45228029 #>>45228207 #>>45228266 #>>45228536 #>>45229440 #>>45229710 #>>45229877 #
epistasis ◴[] No.45225431[source]
Which are the fake costs from regulation?

We have new builds in Europe of the EPR, in France and Finland, and it has had disastrous costs. China has built some too, presumably cheaper, since they keep on building more. What is the regulatory difference there?

I have yet to find any concrete defense of the idea that costs are coming from regulation, rather than the costs of construction in advanced economies.

If regulations are the cost, name them and a solution. Otherwise it seems like we are wasting efforts in optimizing the wrong thing for nuclear.

replies(6): >>45225588 #>>45225822 #>>45225895 #>>45225921 #>>45225935 #>>45225989 #
1. boringg ◴[] No.45225921[source]
Its multifold.

1. Regulations are a big asterisk to any project. If you don't think you will get licensed or your project will get axed halfway through or there is a risk (Which has been very high in the past). Investors who would put money up for the project won't do it OR they require a significantly higher cost of capital. 2. There is very little muscle memory in the fabrication of reactors and reactor components in north America because we de facto shut down the industry from 80s until 20s. Therefore the first projects will cost more money as we recover our abilities to fab. 3. The licensing and regulatory costs are also incredibly high - and you cant make any adjustments if you kick off the project or you restart the process. This leads to massive cost over runs.

China and Korea are currently building reactors about 1/6 the costs of the US I believe.

replies(1): >>45226793 #
2. epistasis ◴[] No.45226793[source]
China is building US and EU designs of reactors at a fraction of the costs in the US and Europe.

Your examples of regulatory asterisks are on the design side of things. I don't think that the cost of capital for Vogtle & Summer in the US, or Flamanville and Olkiluoto in the EU, were excessively high. As for your 3rd point, there were tons of adjustments during the build of Vogtle, which is a big reason for its large cost overruns. Regulation didn't necessitate those changes, they were all construction bungles.

Which I think leads to your point 2, construction competence, being the primary cause, which aligns with everything else I have read on the subject. For example, another poster pointed to this paper:

> We observe that nth-of-a-kind plants have been more, not less, expensive than first-of-a-kind plants. “Soft” factors external to standardized reactor hardware, such as labor supervision, contributed over half of the cost rise from 1976 to 1987. Relatedly, containment building costs more than doubled from 1976 to 2017, due only in part to safety regulations.