←back to thread

435 points crawshaw | 1 comments | | HN request time: 0.358s | source
1. stpedgwdgfhgdd ◴[] No.44002382[source]
Bit of topic, but worth sharing;

Yesterday was for me a milestone, i connected Claude Code through MCP with Jira (sse). I asked it to create a plan for a specific Jira issue, ah, excuse me, work item.

CC created the plan based on the item’s description and started coding. It created a branch (wrong naming convention, needs fix), made the code changes and pushed. Since the Jira item had a good description, the plan was solid and the code so far as well.

Disclaimer; this was a simple problem to solve, but the code base is pretty large.