Based on the headline I thought that this was an enormous capital commitment for an enormous generating capacity, but the deal is with a company called Kairos that is developing small modular reactors with 75 megawatts of electrical output each [1]. 7 reactors of this type, collectively, would supply 525 megawatts (less than half of a typical new commercial power reactor like the AP1000, HPR1000, EPR, or APR1400).

Kairos is in a pretty early stage. They started building a test reactor this summer, scheduled for completion by 2027:

https://www.energy.gov/ne/articles/kairos-power-starts-const...

EDIT: Statement from the official Google announcement linked by xnx below [2]:

Today, we’re building on these efforts by signing the world’s first corporate agreement to purchase nuclear energy from multiple small modular reactors (SMRs) to be developed by Kairos Power. The initial phase of work is intended to bring Kairos Power’s first SMR online quickly and safely by 2030, followed by additional reactor deployments through 2035. Overall, this deal will enable up to 500 MW of new 24/7 carbon-free power to U.S. electricity grids and help more communities benefit from clean and affordable nuclear power.

[1] https://kairospower.com/technology/

[2] https://news.ycombinator.com/item?id=41841108

replies(8): >>41841055 #>>41842094 #>>41842395 #>>41843875 #>>41844253 #>>41845537 #>>41845613 #>>41848283 #
ViewTrick1002 ◴[] No.41842094[source]
Would be extremely interesting to the the $/MWh for the deal to understand the viability.

Otherwise similar to the NuScale deal which fell through last autumn.

A PPA like agreement which then only kept rising until all potential utilities had quit the deal.

All honor to Kairos if they can deliver, but history is against them. Let’s hope they succeed.

> NuScale has a more credible contract with the Carbon Free Power Project (“CFPP”) for the Utah Associated Municipal Power Systems (“UAMPS”). CFPP participants have been supportive of the project despite contracted energy prices that never seem to stop rising, from $55/MWh in 2016, to $89/MWh at the start of this year. What many have missed is that NuScale has been given till around January 2024 to raise project commitments to 80% or 370 MWe, from the existing 26% or 120 MWe, or risk termination. Crucially, when the participants agreed to this timeline, they were assured refunds for project costs if it were terminated, which creates an incentive for them to drop out. We are three months to the deadline and subscriptions have not moved an inch.

https://iceberg-research.com/2023/10/19/nuscale-power-smr-a-...

replies(2): >>41842380 #>>41846359 #
credit_guy ◴[] No.41842380[source]
> All honor to Kairos if they can deliver, but history is against them.

History is not really against them. Our current reactors (mainly pressurized water reactors) are the way they are because Admiral Rickover determined that PWRs are the best option for submarines. He was not wrong, but civilian power reactors are not the same as the reactors powering submarines.

PWRs are expensive mainly because of the huge pressure inside the reactor core, about 150 times higher than the atmospheric pressure. For comparison, a pressure cooker has an internal pressure about 5 times higher than the atmospheric pressure, and such a cooker can explode with a pretty loud bang.

The Kairos Hermes reactor design is based on a design that was tested in the '60s, the Molten-Salt Reactor Experiment [1]. While such a reactor can be used to burn thorium, Kairos decided to go with the far more conventional approach of burning U-235. The reactor operates at approximately regular atmospheric pressure. This should reduce considerably the construction costs.

Of course, there are unknowns. While the world has built thousands of pressurized water reactors, it has built maybe 10 molten salt reactors. For example one quite unexpected effect in the MSRE was the enbrittlement of the reactor vessel caused by tellurium, which shows up as a fission product when U-235 burns.

The Nuclear Regulatory Commission is a very conservative organization, and they don't have much experience with molten salt reactors because nobody has. It took them 6 years to give NuScale an approval for a pressurized water reactor, design that they knew in and out. My guess is that they will not give Kairos an approval without at least 15 years of testing. But Google's agreement with Kairos is quite crucial to keep this testing going.

[1] https://en.wikipedia.org/wiki/Molten-Salt_Reactor_Experiment

replies(6): >>41843113 #>>41843300 #>>41843515 #>>41844374 #>>41846610 #>>41847860 #
cyberax ◴[] No.41843113[source]
> The Kairos Hermes reactor design is based on a design that was tested in the '60s, the Molten-Salt Reactor Experiment

MSRs are a costly distraction. They are not viable without literally hundreds of billions in research and development money. That's why all the MSRs startups are failing long before they even start the licensing process.

> For example one quite unexpected effect in the MSRE was the enbrittlement of the reactor vessel caused by tellurium, which shows up as a fission product when U-235 burns.

It was not unexpected. The _main_ issue with MSRs is that they have to contain fluoride salts that release elemental fluorine radicals as a result of radiolysis. So the reactor vessel walls will be eaten up by them, rather rapidly. Especially when reactors are scaled up to a level that makes them practical. And then you have all the fission byproducts that literally include almost all the Periodic Table.

replies(2): >>41844000 #>>41844329 #
Dylan16807 ◴[] No.41844329[source]
> They are not viable without literally hundreds of billions in research and development money.

The US produces 40000 billion kWh every decade, so that doesn't really seem that bad to me.

replies(2): >>41844399 #>>41844557 #
cyberax ◴[] No.41844557{3}[source]
Sure. But why? MSRs don't have any real features that are worth spending that much money.

Modern PWRs are just as passively safe, if they lose cooling and melt down, the molten fuel will be safely contained by the core catcher.

Uranium is also not scarce, and if we want to get into breeding reactors, existing fuel reprocessing is an established industry, on which we _already_ have spent several hundred billion dollars.

replies(1): >>41846476 #
roenxi ◴[] No.41846476{4}[source]
The thing about R&D spending is that it is speculative. Even if that question does have satisfying answers; it is unreasonable to expect people to prove that R&D will have a commercially successful outcomes with foresight.
replies(1): >>41850384 #
1. cyberax ◴[] No.41850384{5}[source]
Then why not fund fusion reactors?

Or maybe thorium reactors ON A ZEPPELIN! With microwave power transmission. After all, if the objective to spend money on research, then what can be cooler than a nuclear reactor on a blimp?

replies(2): >>41854653 #>>41855867 #
2. roenxi ◴[] No.41854653[source]
If you actually think that is a good idea you can try to give it a go. There are worse things to dedicate a life to and it might have big applications in disaster recovery scenarios or something.
3. LargoLasskhyfv ◴[] No.41855867[source]
You know? That sounds actually interesting because of https://en.wikipedia.org/wiki/Hydrogen-moderated_self-regula...

Hydrogen can be so hawt!1!!