←back to thread

210 points dakshgupta | 1 comments | | HN request time: 0.197s | source
1. JohnMakin ◴[] No.41849876[source]
This is a common "pattern" on well-ran ops teams. The work of a typical ops team consists of a lot of new work but tons of interruptions come in as new issues arise and must be dealt with. So we would typically assign 1 engineer (who was also typically on call) a lighter workload and would be responsible for triaging most issues that came in.