Based on the headline I thought that this was an enormous capital commitment for an enormous generating capacity, but the deal is with a company called Kairos that is developing small modular reactors with 75 megawatts of electrical output each [1]. 7 reactors of this type, collectively, would supply 525 megawatts (less than half of a typical new commercial power reactor like the AP1000, HPR1000, EPR, or APR1400).

Kairos is in a pretty early stage. They started building a test reactor this summer, scheduled for completion by 2027:

https://www.energy.gov/ne/articles/kairos-power-starts-const...

EDIT: Statement from the official Google announcement linked by xnx below [2]:

Today, we’re building on these efforts by signing the world’s first corporate agreement to purchase nuclear energy from multiple small modular reactors (SMRs) to be developed by Kairos Power. The initial phase of work is intended to bring Kairos Power’s first SMR online quickly and safely by 2030, followed by additional reactor deployments through 2035. Overall, this deal will enable up to 500 MW of new 24/7 carbon-free power to U.S. electricity grids and help more communities benefit from clean and affordable nuclear power.

[1] https://kairospower.com/technology/

[2] https://news.ycombinator.com/item?id=41841108

replies(8): >>41841055 #>>41842094 #>>41842395 #>>41843875 #>>41844253 #>>41845537 #>>41845613 #>>41848283 #
onepointsixC ◴[] No.41841055[source]
Yeah I’m not going to lie, that’s quite disappointing. Google funding several AP1000’s would be huge.
replies(4): >>41841072 #>>41841432 #>>41841621 #>>41844089 #
iknowstuff ◴[] No.41841072[source]
seeing how 2GW of nuclear cost $34B in Georgia, why would Google waste $120B when they can get the same output for at most half the price (and realistically more like 1/10th) using renewables and batteries? and they’d have results in 2 years instead of 2 decades.

edit: to be clear, 1GW of wind or solar is $1B. Build 3GW for overcapacity and you’re still at just 17% of the cost of 1GW of nuclear, and you technically have 3x more capacity. Now figure out how many megapacks you can buy for the $14B/GW you saved https://www.tesla.com/megapack/design (answer: 16GW/68GWh)

replies(9): >>41841088 #>>41841147 #>>41841158 #>>41841606 #>>41843120 #>>41843823 #>>41844522 #>>41845945 #>>41846378 #
JumpCrisscross ◴[] No.41841147[source]
> using renewables and batteries? and they’d have results in 2 years instead of 2 decades

We have nothing close to the battery fabrication pipeline to make that timeline true, certainly not at scale. If this move works, Google will have cemented its power needs and economics for decades to come.

replies(4): >>41841275 #>>41841498 #>>41841512 #>>41842549 #
matthewdgreen ◴[] No.41841512[source]
Global battery manufacturing capacity was 2,600GWh in 2023 [1], and has probably already exceeded that this year. The IEA projects closer to 4TWh by 2025, and nearly 7TWh by 2030 [2].

You need to pay attention because this is happening fast.

[1] https://www.bloomberg.com/news/newsletters/2024-04-12/china-... [2] https://www.iea.org/data-and-statistics/charts/lithium-ion-b...

replies(1): >>41841634 #
JumpCrisscross ◴[] No.41841634[source]
> nearly 7TWh by 2030

That's a big number. Here's a bigger one: 30,000 TWh, about our current electricity consumption [1]. 7 TWh in 2030 is less than 1/4,000th total electriciy production today. (You obviously don't need 1:1 coverage. But 2 hours in 2030 against a year's demand today is still a nudge.)

Now consider EVs. Then add the tens of TWh of annual power demand AI is expected to add to power demand [2]. (And I'm assuming a free market for battery cells, which obviously isn't where we're heading. So add local production bottlenecks to the mix.)

Battery numbers are going up. But they aren't going up fast enough and never could have, not unless we ditch electrifying transportation. Nukes or gas. Anyone pretending there is a third way is defaulting to one or the other.

[1] https://www.iea.org/reports/electricity-information-overview...

[2] https://www.goldmansachs.com/insights/articles/AI-poised-to-...

replies(9): >>41841796 #>>41841957 #>>41841969 #>>41842073 #>>41842132 #>>41842204 #>>41844378 #>>41844409 #>>41846922 #
ViewTrick1002 ◴[] No.41842132[source]
5 hours of storage and a 98.6% renewables system.

https://reneweconomy.com.au/a-near-100-per-cent-renewable-gr...

Investing in nuclear power today is an insane prospect when the energy market is being reshaped at this speed.

In Europe old paid off nuclear plants are regularly being forced off the markets due to supplying too expensive energy.

This will only worsen the nuclear business case as renewable expansion continues, today being a bonanza fueled by finally finding an energy source cheaper than fossil fuel.

Nuclear power is essentially pissing against the wind hoping the 1960s returns.

replies(3): >>41842457 #>>41845675 #>>41846390 #
JumpCrisscross ◴[] No.41842457[source]
> nuclear power today is an insane prospect when the energy market is being reshaped at this speed

We’re still more than a decade away from having enough batteries to make this shift. Again, excluding EVs and AI. That’s why we’re reänimating coal plants and building new gas turbines.

I’d also love to see the numbers on that simulation going from 98.6% coverage to what we expect from a modern grid. (And if the balance is provided by gas or something else.) It should surprise nobody that going from 1 sigma to 2 can cost as much as 2 to 3, even if the percentage gap is much smaller.

> Europe old paid off nuclear plants are regularly being forced off the markets due to supplying too expensive energy

Europe has invested €1.5tn into new gas infrastructure. That doesn’t go poor without a fight and collateral damage.

replies(3): >>41842571 #>>41842889 #>>41844030 #
matthewdgreen ◴[] No.41844030[source]
> We’re still more than a decade away from having enough batteries to make this shift.

A decade to have significant amounts of battery storage is actually a pretty optimistic timeline compared to nuclear. Nuclear plant construction times are on the order of a decade or (realistically) two decades in the West, if you include planning. In China they're managing 7 years, but their nuclear buildouts, while impressive, aren't trending an upward path when compared to renewables (see chart here [1].) SMRs might change this, but they're years from leaving "research" status and entering the mass-production/learning curves that could make them cost competitive.

This doesn't make me happy. If I thought nuclear was viable on the timelines we have to dampen climate change, I'd be 100% in favor of it. If we could assemble the political will to raise taxes and build nuclear at "wartime" speeds, I'd say go for it. I'm also very much in favor of SMR development, just not willing to bet the house on it.

As it stands, there isn't anywhere near enough nuclear power in the planning pipeline for nuclear to matter much on a 20 year timeline.

In any case, we are not going to a 100% renewable/battery grid in 10 years. The first goal is to get renewables to 90-95% or more of power generation, massively overbuilt with short-term battery storage backed by intermittent fossil fuels for the remaining 5-10%. This will represent a massive reduction in emissions. The last 5-10% will have to be completed over the next couple of decades, and the increasing battery production trend gives hope that it can be.

The worst problem with existing nuclear is that with a 15-20 year planning/construction timeline and the current molasses build rate, new nuclear plants will arrive right at the moment when cheap storage is eating the economic use-cases that make them financially viable.

[1] https://cleantechnica.com/wp-content/uploads/2022/10/China-r...

replies(2): >>41844245 #>>41844256 #
JumpCrisscross ◴[] No.41844245[source]
> * Nuclear plant construction times are on the order of a decade or (realistically) two decades in the West, if you include planning*

Sure. Forecasting twenty years out is tough. But our forecasts out 10 years show the power crunch easing to almost no degree--we'll still likely be making the same tradeoff then as now. (And, I suspect, still filling the gap with gas in teh west.)

You're broadly correct: we need to build faster. There is no reason we can't build a large plant in under a decade and an SMR in a few years. The latter is what Google is experimenting with here. It's a long shot. But so is hoping battery production scales the orders of magnitude necessary for it to become a utlity backbone over the next decades.

> first goal is to get renewables to 90-95% or more of power generation, massively overbuilt with short-term battery storage

We don't have the battery pipeline. What we're repeatedly getting is renewables plus gas generators. There is no world in which you put down trillions of dollars of gas infrastructure and then poof it in a few years because it's no longer needed.

replies(1): >>41846721 #
1. ViewTrick1002 ◴[] No.41846721[source]
California would like a word with you. Gas generators are increasingly being forced off the grid with storage.

https://blog.gridstatus.io/caiso-batteries-apr-2024/

Storage costs are today lower than the most aggressive projection for 2050 according to one widely cited US DoE study from 2023.

https://substack.com/home/post/p-149971818